NMS Engineer (with Netviewer experience)
Location : Malaysia
Nationality :Malaysian ONLY
The scope of work is follows but not limited to:
1. PDH/SDH/Mux: SRAL XD, and SDH SRT1x, SRA HC
a. IP address assignment
b. DCN Planning
c. Daily monitoring
d. Punchlist /docket clearance
e. Provide NMS/DCN info for telecom implementation
2. Netviewer/TNMS M/EMOS:
- Nodes creation
- Troubleshooting loss connectivity
- Monitor Visibility of microwave sites
- Hardware/software upgrades of microwave sites.
- Assist in solving problematic links after office hours which involved downtime.
Others
a. Participate in ad hoc projects or initiatives related to Microwave and Netviewer
b. System admin of Netviewer system
c. Ensure backup is taken every month from Netviewer
d. Ensure proper documentation is done for integrated sites.
e. Interface with NSN project team
f. Interface with Maxis personnel
g. Maintain the updated DCN plan for all regions in cooperation with Maxis/NSN
h. To provide daily/weekly report, as and when requested by Maxis/NSN project team
I. To provide feedback to project team upon completion of nodes creation on weekly basis
Contact
asia@connect44.com
Location : Malaysia
Nationality :Malaysian ONLY
The scope of work is follows but not limited to:
1. PDH/SDH/Mux: SRAL XD, and SDH SRT1x, SRA HC
a. IP address assignment
b. DCN Planning
c. Daily monitoring
d. Punchlist /docket clearance
e. Provide NMS/DCN info for telecom implementation
2. Netviewer/TNMS M/EMOS:
- Nodes creation
- Troubleshooting loss connectivity
- Monitor Visibility of microwave sites
- Hardware/software upgrades of microwave sites.
- Assist in solving problematic links after office hours which involved downtime.
Others
a. Participate in ad hoc projects or initiatives related to Microwave and Netviewer
b. System admin of Netviewer system
c. Ensure backup is taken every month from Netviewer
d. Ensure proper documentation is done for integrated sites.
e. Interface with NSN project team
f. Interface with Maxis personnel
g. Maintain the updated DCN plan for all regions in cooperation with Maxis/NSN
h. To provide daily/weekly report, as and when requested by Maxis/NSN project team
I. To provide feedback to project team upon completion of nodes creation on weekly basis
Contact
asia@connect44.com
No comments:
Post a Comment